YC CEDAR SHAKE REPLACEMENT
Client: PriVATE HOMEOWNER
Project Type: Roof Remodel – Cedar Replacement
PROJECT SCOPE
Yellowstone Club
This cedar replacement project included the removal of the existing cedar shake roof and installation of a Brava Cedar Shake system in Canyon Gray. The project was driven by the need to replace the original cedar shake with a composite material as part of a full Class A roof assembly. CMS verified the existing metal conditions, preserved metal where replacement was not required, installed new underlayment and interlayment, addressed key exterior envelope transitions, and completed the roof with engineered snow retention by TRA Snow and Sun.
Timeline: Spring / Early Summer 2026
Project completed ahead of July 1st deadline
Project Process: CMS performed a full cedar shake tear-off and prepared the roof for a composite cedar shake replacement. Titanium PSU 30 underlayment was installed throughout the roof areas, followed by SolarHide interlayment to support the full Class A roof assembly. At critical transition points, stone and siding were removed so the underlayment could be properly wrapped and tied into the surrounding exterior envelope. The finished roof system included Brava Cedar Shake shingles in Canyon Gray, Ultra Low Gloss Slate Gray trim details by Elevated Metal Solutions, and a TRA Snow and Sun engineered snow retention system designed for the shingle assembly.
PROJECT PROCESS
IN-PROCESS PHOTOS
BEFORE CEDAR REPLACEMENT
BEFORE PHOTOS







